The Narrabri North underground mine is located between Boggabri and Narrabri within Mining Lease 1609.
Construction has commenced on Stage 1 of the mine.
Initial production using continuous miners will be 1.5 million tonnes per year. A rail loop will be constructed for rail transport of coal from the project site to Newcastle for export.
Stage 2 plans include the production of an additional 4.5 million tonnes per year from longwall mining. An Enivronmental Assessment is being carried out for the longwall phase.